PJSC “Ukrhydroenergo” (UHE) implements the World Bank-financed Project P176114 “Ukraine - Improving Power System Resilience for European Power Grid Integration” and intends to procure the following equipment:
Battery Energy Storage Systems (BESS) with Energy Management Systems (EMS) and Ancillary Equipment at Kyiv HPP / PSP, Kaniv, Kremenchuk and Seredniodniprovska Hydropower Plants, including related services (design, assembly, commissioning and training of UHE staff)

The sites where the systems need to be installed are located in Ukraine on the territory of UHE branches at the following locations:

  • "Kyiv HPP and PSP Cascade" (town of Vyshhorod, Vyshhorodskyi district, Kyivska region);
  • "Kaniv HPP" (town of Kaniv, Cherkaskyi district, Cherkaska region);
  • "Kremenchuk HPP" (town of Svitlivodsk, Oleksandriiskyi district, Kirovohradska region);
  • "Seredniodniprovska HPP" (town of Kamianske, Kamianskyi district, Dnipropetrovska region)

The implementation of the contract will contribute to improving the reliability of energy supply and enhancing the resilience of the energy system of Ukraine, ensuring greater reliability and flexibility of the United Energy System of Ukraine.

The integration of ESS will help compensate for uneven generation, increase energy security, and ensure stable operation in conditions of increased risks, including those related to external factors.

It is planned to install an Energy Storage System (ESS) with an estimated operating capacity of up to 197 MW (the capacity of the ESS shall be at least twice its rated capacity)  to provide ancillary services, which, thanks to the combined (hybrid) operation mode with the hydro-units of PJSC “Ukrhydroenergo”, will provide highly efficient and fast-responding ancillary services, and to create an energy management system (EMS) at four Hydro Power Plants (HPPs), including Kyiv HPP, Kaniv HPP, Kremenchuk HPP, and Seredniodniprovska HPP, located along the Dnipro River - the main hydro power generation artery in Ukraine.

The systems are expected to be deployed in four separate stages:

І) Kyiv HPP: 46 MW (approximately 9,9 ths. m2 land plot allocated for deployment);

ІІ) Kaniv HPP: 66 MW (approximately 12,7 ths. m2 land plot allocated for deployment);

ІІІ) Kremenchuk HPP: 60 MW (approximately 15,4 ths. m2 land plot allocated for deployment); and

ІV) Seredniodniprovska HPP: 25 MW ( approximately 6,6 ths. m2 land plot allocated for deployment).

Urban planning conditions and restrictions have been obtained for all the specified land plots, and engineering and geodetic surveys have been performed.

During preliminary designing by UHE, the options for connecting the ESS to networks of Kyiv HPP, Kaniv HPP, Kremenchuk HPP and Seredniodniprovska HPP have been developed and agreed with NPC Ukrenergo, which is the transmission system operator (TSO) of Ukraine and, in accordance with the Law of Ukraine “On the Electricity Market,” is responsible for the reliability and safety of the United Energy System (UES) of Ukraine. The network operating modes have been calculated and preliminary analysis of impact of the ESS operation on the level of short-circuit currents have been carried out.

All work related to connecting the networks of the designed facility to the TSO networks shall be performed by the contractor.

For further design, it is planned to perform geological, hydrogeological, engineering and hydrometeorological works according to the developed plan.

Technical indicators of the Project:

Title

Stage 1 -

Kyiv HPP

Stage 2 -

Kaniv HPP

Stage 3 -Kremenchuk HPP

Stage 4 -Seredniodniprovska HPP

Construction type

New construction

New construction

New construction

New construction

Class of consequences (liability) of the facility according to the official classification of buildings and structures by the level of possible damage (economic, social, environmental, or human losses) that may occur in the event of destruction or failure of this facility.

СС2

(Medium consequence class)

СС3

(High consequence class)

СС3

(High consequence class)

СС2

(Medium consequence class)

The level of protective structures of the facility in accordance with the concept of engineering protection of critical infrastructure facilities (EP CIF) “Fortress Country.”

First increased

First increased

First increased

First increased

ESS estimated capacity, MW

(as of the moment of procurement)

55

80

70

30

ESS operating capacity for the first year of operation, MW

46

66

60

25

Power to capacity ratio, at least

1:2

1:2

1:2

1:2

Battery type

lithium iron phosphate (LFP)

lithium iron phosphate (LFP)

lithium iron phosphate (LFP)

lithium iron phosphate (LFP)

Approximate number of container-type ESS (BESS) blocks (2 batteries + inverter), pcs.

22

32

28

12

ESS (BESS) transformer substation block , approx. pcs.

11

16

14

6

The need for designing a 110(150) kV substation

1

1

-

1

Connection point voltage, kV

110

110

10

150

Number of supports of 110 (150) kV OHL, pc.

1

-

-

1

110 (150)/10 kV transformers

1×60 MVA

1×80 MVA

-

1×40 MVA

Number of 10kV switchgears

1

2

2

1

Approximate length of electric raceway for connection to own networks (TSO networks), km

0,97

1,65

0,46

0,11

Plant management controller with EMS, SCADA, etc. software

1

1

1

1

The scope of the contractor’s design will include, but not limited to, general lay-out and transport wire mesh fencing around the perimeter of ESS and substation, video surveillance, access control system, lighting, grounding system, lightning protection, fire alarm and fire extinguishing system, security alarm system, oil head, electrical networks for power accumulation and delivery.

The operation of the ESS is considered in the ancillary services market for the provision of secondary control services, namely automatic frequency restoration reserve (aFRRl, aFRRs) and, additionally, the provision of primary control services – frequency containment reserve (FCR).

The equipment layout plan, electrical connection diagrams, circuit diagrams, main technical specifications, and equipment characteristics for each construction phase are provided in Annex available for downloading at the following link: https://drive.google.com/drive/folders/1yKLIKOJdCeEzaPtVTnDpAfYPJ6jrT0QG?usp=drive_link

The procurement shall be conducted in accordance with the World Bank rules and procedures using the Standard Procurement Document (SPD) “Request for Bids - Goods (Two-Envelope Bidding Process)” available at https://thedocs.worldbank.org/en/doc/91e2b715142f30d08e3f4d10c725c50b-0290012025/original/SPD-Request-for-Bids-GOODS-Two-Envelope-Feb-2025.docx

Draft Qualification criteria are provided in Annex 1.

The Evaluation Criteria will include price and non-price criteria (Rated Criteria) to determine the Most Advantageous Bid. It is expected that the cost factor will have 80% weight and non-price (technical) factor will have 20% weight.

The Contract conditions will cover, in addition to the supply of equipment, the following related services:

  • preparation of formal design for installation of the ESS on the sites, including obtaining the required design approvals/expert review as per the national legislation of Ukraine;
  • installation and commissioning of the supplied equipment according to the design; and
  • training of UHE personnel in operation and maintenance of the installed ESS.

UHE envisages the possibility of providing an advance payment of up to 40% of the Contract Price, subject to the submission of an Advance Payment Security (unconditional bank guarantee).

UHE invites potential manufacturers, suppliers, or their authorized representatives to participate in the Virtual Market Sounding and Consultation Workshop via Zoom on November 20, 2025, at 11:00 am Kyiv (Ukraine) time, to discuss realistic and optimal options for delivery deadlines, delivery conditions, and key requirements for the scope of related services. The discussion is expected to last no more than 3 hours. The webinar will be conducted in English, and translation into Ukrainian will be provided for local potential bidders.

Please note that the webinar is for informational purposes only and is intended solely to promote a better understanding of the market for UHE. It is not a part of the formal bidding process.

To support the discussion, we ask you to provide the information in form of Questionnaire specified in the Annex 2.

In case of suggestions/proposals to amend the UHE draft technical or other requirements, please provide them prior to the Workshop following the form provided in Annex 3 or express during the EME.

All information provided will be treated as confidential and will not be shared with other participants or disclosed during the Workshop.

 

The UHE contact person for this market engagement is:

Olga Hryshchenko - Director of International Projects Implementation Department PJSC “UKRHYDROENERGO”
E-mail: [email protected] 

Alina Cherniaieva – Contract Manager, International Projects Implementation Department PJSC “UKRHYDROENERGO”
E-mail: [email protected]

 

Link to the webinar on the Zoom platform:

Topic: Virtual Market Sounding and Consultation Workshop

Time: Nov 20, 2025 11:00 Kyiv

Join Zoom Meeting:

https://us06web.zoom.us/j/82429744952?pwd=qbTD8TJ2CHFcoHbyz2t3qhy8bgaaiF.1 

Meeting ID: 824 2974 4952

Passcode: 185402 

 

We look forward to your participation. 

 

Annex 1 - Draft Qualification Criteria

Annex 2 – Questionnaire

Annex 3 – The Form for Submission of Suggestions/Proposals for the Modification of UHE Requirements

 

Annex 1

DRAFT QUALIFICATION CRITERIA

Financial capacity:

The Bidder shall provide audited financial statements or, if not required by the laws of the Bidder’s country, other financial statements acceptable to the Purchaser for the last five (5) fiscal years prior to the deadline for submission of bids, demonstrating the Bidder’s current financial stability. For joint ventures, this requirement shall be met by each bidder.

The Bidder or any of the partners of the Joint Venture shall not be in bankruptcy proceedings and/or in a state of bankruptcy on the date of the Bid submission, in accordance with the provisions of the legislation of the country of its registration.

The Bidder or any JV partner shall provide a certificate/extract, etc. from the relevant state register or authority responsible for recording information on declared bankruptcy proceedings and/or open criminal proceedings in accordance with the legislation of the country of registration, confirming that the Supplier/a JV partner is not in a state of bankruptcy and/or subject to criminal proceedings.

Specific Experience: The Bidder shall demonstrate that it has successfully and substantially completed at least one (1) contract within the last 5 (five) years with a value of at least 120 million US dollars in equivalent, or at least two (2) contracts each with a value of at least the equivalent of US dollars 80 million that are similar in nature and complexity to the Goods and Related Services under this Contract.

Manufacturing experience and Technical Capacity: The Bidder who is the manufacturer of the equipment to be offered shall provide documentary evidence (for instance, copies of extracts from contracts, acceptance test reports, commissioning reports, etc.), to demonstrate the following:

(i) The Bidder has manufactured goods of similar nature and complexity, namely Battery Energy Storage Systems (BESS), with a total output power capacity from 100 MW to 200 MW, with an Energy Management System (EMS), for at least the past five (5) years; and

(ii) The Bidder has manufactured goods of similar nature and complexity, namely Battery Energy Storage Systems (BESS), with an operating capacity of at least 25 MW, with an EMS, for at least the past five (5) years, with a total quantity of at least four (4) units of such equipment; and

(iii) The Bidder has manufactured and commissioned at least four (4) BESS units with EMS during the past five (5) years.

If the Bidder is a joint venture (JV), all partners of the JV shall collectively meet the above requirement in terms of the number of contracts executed.

In order to verify compliance with this requirement, the Bidder shall provide copies of relevant contracts and acceptance certificates (or other acceptable evidence of contract performance) and customers’ feedback. For the installation of equipment, which will include construction work, the Bidder or its subcontractor shall provide a license for economic activity with an annex including the list of works, or a Declaration on conducting economic activity, which allows to perform the works specified in the technical specification and perform works on the sites that, by the class of consequences (responsibility), belong to sites with medium (CC2) and high consequences (CC3).

If a bidder’s license has been issued by the licensing authority in electronic form (a record of the licensing authority's decision to issue a license to a business entity in the Unified State Register of Legal Entities, Individuals - Entrepreneurs and Public Organizations), then such bidder shall provide an extract from the Unified State Register of Legal Entities, Individuals - entrepreneurs and public organizations, which includes information about the issuance of the license or the decision of the licensing authority, or a certificate in no particular form signed by an authorized person of the bidder, containing information about the availability of an electronic license in the license register.

The Bidder may engage subcontractors to provide related services.

 

Production capacities:

If the Bidder is not the manufacturer of the equipment, manufacturer authorization shall be required, i.e. the Bidder shall provide evidence that it is duly authorized by the manufacturer(s).

The Bidder shall provide a copy of the ISO 9001:2015 certificates or the corresponding European standard or DSTU ISO 9001:2015 certificates, valid as of the date of bid submission, issued by specialized organizations to the manufacturer or manufacturers of the proposed equipment; a valid certificate from i.  ISO 14001, which is the standard for environmental management systems (EMS), and ii. ISO 45001, which is the international standard for occupational health and safety (OH&S).

 History of contract non-performance:

The Bidder shall demonstrate the absence of unfulfilled or prematurely terminated contracts during the last 5 years.

 

Annex 2

Questionnaire:

The questionnaire can be completed either with your company's identification or anonymously. However, if you provide basic identification information of your company (name, contact person, etc.), this would:

  • facilitate the establishment of business contacts to clarify technical or organizational issues;
  • allow us to properly consider your interests and experience in shaping the terms of the procurement.

All information that you provide will be used exclusively for the purpose of preparing for the project implementation and will not be disclosed to third parties.

Questions / Information required

Requested information

1. Experience in the field of ESS

  • Does your company have experience in implementing projects in the field of Energy Storage Systems (ESS), and for how many years?
  • Does your company have relevant experience in implementing projects in Ukraine?
  • Does your company have an established local partner/contractor in Ukraine to perform design/construction or other services? If yes, please provide information about this company.
  • If your company has an established local partner/contractor in Ukraine, please provide a short description of several implemented projects (name, country, year, ESS capacity, technology, role of your company)
  • Which energy storage systems have you implemented? (Li-ion batteries, LFP, lead-acid batteries, other)
  • Does your company have experience in considering Environmental Impact Assessment (EIA) and environmental support requirements in the design and construction of ESS?
  • Does your company have experience in implementing projects financed by the World Bank or in accordance with the rules of other international financial organizations?

 

2. List of services that the company can provide

For each service listed, please indicate whether your company can perform it using their own resources or through partnerships:

  • Design research
  • Design documentation development
  • Passing the design expertise
  • Author supervision and support at all stages of design work and the project implementation
  • Supply of equipment and components
  • Construction and installation works (including the construction of protective structures for critical infrastructure facilities)
  • Pre-commissioning activities
  • Commissioning
  • Waste recording and waste management 
  • Maintenance / service / operation
  • Training of UHE's personnel at the project sites

 

3. Availability of licenses and certificates

  • Does your company have valid licenses to carry out design and construction works in Ukraine (for facilities of class CC3 consequence (liability))?
  • What international quality certificates does your company have? (ISO, IEC etc)
  • Does your company have a certificate of the international standard of the environmental management system ISO 14001:2015?

 

4. Human resource information*

  • Does your company have a qualified and certified Project Chief Engineer (GIP)?
  • What is the estimated number of full-time design engineers by design section?
  • Does your company have specialists in Environmental Impact Assessment (EIA) and waste management?
  • Does your company have certified engineering and technical specialists and contractors for construction and installation works in the energy sector?
  • Does the company have any partnership agreements with manufacturers of ESS, and if yes, please specify which ones?

* provided that all construction stages are implemented simultaneously

 

5. Estimated completion timing

  • What timing for the next stages of work do you consider realistic, assuming that all stages of construction will be carried out simultaneously:
  • design
  • delivery
  • installation
  • construction of protective structures
  • pre-commissioning
  • commissioning

 (or)

  • What is the estimated timeframe for the implementation of an ESS design project with a capacity of up to 200 MW that your company can offer (from design stage through commissioning, including equipment delivery)?

 

6. Resources for simultaneous work execution

  • Does your company have the capabilities (the necessary number of personnel and equipment) to perform construction and installation work simultaneously at all four sites?

 

7. Experience in the construction of protective structures for critical infrastructure facilities

  • Does your company have proven experience in design and construction of reinforced first-level or second-level protective structures (shelters, bunkers, protected structures) for critical infrastructure facilities?

 

8. Timing for preparing a proposal (bid)

  • How long will it take your company to prepare a bid for an international competitive bidding?

 

9. Readiness to perform the contract in the context of military operations / risks to security

  • Please confirm whether you are able to provide the full range of services and works under the contract (including supervision by representatives of foreign companies) in the context of the ongoing aggression by the russian federation and under martial law.

 

10. Contract terms

 

What insurance coverage would you be able to provide in Ukraine? Will the insurance cover war risk? 

 

What percentage of the total contract price do you consider acceptable as an advance payment?

 

Do you have any warnings about the possibility of issuing a bank guarantee for an advance payment?

 

Do you observe any problems with delivery to final destinations (project sites) on the CIP final destinations basis?

 

11. Additional information

  • Please list any questions you would like to discuss during the virtual workshop.

 

 

Questionnaire (included in the letter):

If you wish, you may omit your company’s identification. However, providing it will help us for any follow up if needed.

Company name

 

 

Contact person

 

 

 

Annex 3

The Form for Submission of Suggestions/Proposals for the Modification of UHE Requirements

Reference to the number of the requirement

 

Risk to the UHE in the current wording

a description of the risks is provided

Proposal to amend the wording of a technical requirement

proposals are made for new or amended wording of the requirement

Expected benefit for the UHE in case of changes

a description of the potential benefits and positive factors for the Buyer in the event of acceptance of recommendations to change the requirement is provided

 

Друкувати

Поділитися: